The success of our projects is also our success. Our work inspires us every day to do our best

Client:
CWH Construction GmbH

Location // Project:
Austria // Schwechat

Technical parameters:
EXC 3; factory production, delivery and on-site installation of 123 062 kg double-track railway bridge


Client:
Swietelsky Magyarország Kft.

Location // Project:
Kaposvár //Kaposvár IMCS

Technical parameters:
EXC 3; factory production, delivery and on-site installation of 438 265 kg pedestrian and bicycle bridge


Client:
CWH Construction GmbH

Location // Project:
Austria // Marchegg

Technical parameters:
EXC 3; factory production, delivery and on-site installation of 113 121 kg pedestrian and bicycle bridge


Client:
CWH Construction GmbH

Location // Project:
Austria // JANE JACOBS STEG

Technical parameters:
EXC 2; factory production, delivery and on-site installation of 68 540 kg pedestrian and bicycle bridge


Client:
CWH Construction GmbH

Location // Project:
Austria // Münchendorf bridge

Technical parameters:
EXC 2; factory production, delivery and on-site installation of 25 642 kg composite bridge


Client:
TOMOS Kft.

Location // Project:
Budapest, floating dock

Technical parameters:
EXC 2; overall dimensions: 20 x 14.5m, production of 26 870 kg steel structure


Client:
KÉSZ Építő és Szerelő Kft.

Location // Project:
Product design, production and on-site installation of the steel structure and auxiliary structures of Abaújvár – Hernád river // Road bridge

Technical parameters:
EXC 3; overall dimensions: 60 x 11 x 15 m, 151 400 kg steel structure + 87 400 kg auxiliary structure.


Client:
MARKET Zrt.

Location // Project:
Product design, production and on-site installation of steel structures, Gyöngyöshalász

Technical parameters:
EXC 2; production of 128 000 kg steel structure


Client:
ZÁÉV Zrt., ÉPKAR Zrt.

Location // Project:
Product design, production and on-site installation of the steel structures of the hall building, Budapest

Technical parameters:
EXC 3; production of 208 000 kg steel structure


Client:
ZÁÉV Zrt.

Location // Project:
Product design, production and on-site installation of the steel structures of the hall building, Nagykanizsa

Technical parameters:
EXC 3; production of 324 000 kg steel structure


Client:
Lakógép Kft

Location // Project:
Környe, Volta Energy Solutions gyárbővítés. Gép- és csőtartó szerkezet, kapcsolódó lépcső korlát elemekkel.
Üzemi gyártás, szállítás, helyszíni szerelés

Technical parameters:
253.000 kg horganyzott acélszerkezet


Client:
Market Építő Zrt

Location // Project:
LIDL Logisztikai Raktárközpont Ecser, acél és lakatosszerkezetek (cső-, és tetőgéptartó, acélfödémek,
menekülőlépcsők, ütközésvédők) gyártmánytervezése, üzemi gyártása, szállítása és helyszíni szerelése.

Műszaki Paraméterek:
450.000 kg horganyzott acélszerkezet

Request an offer from us

Even in the phase of providing our offer, we always make sure to reach an agreement in accordance with the priorities of our customers. We set deadlines that we can meet to the satisfaction of our customers.

dnaadminReferences